This document describes the renovation projects that Epsilon Theta would like to undertake. The building is at 259 Saint Paul St. in Brookline, MA. It is a wood frame building built in 1890. There are 3 stories, plus a basement.

The last renovations of this scale were undertaken in the 1960's, however smaller projects have been done more recently, such as: Roof replacement in the late 1980's, life safety improvements in 1993, replaced the front porch in 1994, and general maintenance.

A few of the projects listed in this document have been completed and are labelled as such. They are included here for completeness, since we consider them part of this renovation effort.

Appendix A provides labelled sketches of the building layout for reference throughout this document. Appendix C provides a schedule for hiring the archictects for this project and will be expanded to include the general fundraising and construction schedule in the near future.

Room Renovations

Renovate Women's Head

Completely renovate Women's Head, with the goal of using the available space more efficiently. Figure 1 shows the current layout of Women's Head.


  
Figure 1: Current Women's Head Layout
\begin{figure}
\begin{center}
\epsfxsize=6in \epsfbox{womenshead.eps}
\end{center}\end{figure}

Renovate Kitchen

Bring the kitchen up to current health code, and rearrange the floor plan for more efficient use of space.

Renovate Chapter Room

The Chapter Room will undergo complete renovation.

Renovate Guest Head

Guest Head will be renovated to be handicapped accessible.


  
Figure 2: Proposed Guest Head renovation
\begin{figure}
\begin{center}
\epsfxsize=6in \epsfbox{guest-head.eps}
\end{center}\end{figure}

Interior

Windows and Doors

Replace Windows

We will repair or replace all the openable windows on the first and second floor.

Big Back Bay Window

Additional support is required for the sagging bay window in big back. It is not possible to determine exactly what work is needed to adequately support it until interior finishes are removed, but three possible solutions have been offered by CBI Consulting, Inc:

Front Door Frame

The front door frame will be replaced by a similar, but tighter fitting and more historically correct frame and windows. A sketch of new frame may be found in figure 3.


  
Figure 3: Proposed front door frame replacement
\begin{figure}
\begin{center}
\epsfxsize=3.5in \epsfbox{front-door.eps}
\end{center}\end{figure}


  
Figure 4: Sketch of Proposed Leaded Glass Window
\begin{figure}
\begin{center}
\epsfxsize=6.5in \epsfbox{front-door-window.eps}
\end{center}\end{figure}

Pocket Doors

Refurbish both pocket doors:

Exit Door

Replace first floor side door and frame with similar door and frame.

Walls and Ceilings

Replace Walls and Ceilings

Replace walls and ceilings inside the house that are in need of repair.

Dining Room Ceiling

Eliminate lower area in the bay area of the dining room.

Flooring

Parquet Flooring

Replace parquet flooring on first and second floors with strip oak.

Pit Floors

Completely redo the floors in Pit Proper and Pit Improper.

Refinish Dorm Floor

Refinish the floor in the Dorm.

Utilities

Electrical

Lighting

Replace most of the ceiling lighting fixtures. This may be taken care of by the Boston Edison work being done currently. All personal room lighting, front rooms, hallways, and dining room lighting will be replaced. A light will be added at the front of the second floor hallway.

Additional Electrical Outlets

More electrical outlets will be added to personal rooms.


  
Figure 5: Proposed Placement of Electrical Outlets
\begin{figure}
\begin{center}
\epsfxsize=6.5in \epsfbox{proposed-outlets.eps}
\end{center}\end{figure}

Additional Circuits

Several areas of the house require additional electrical circuits to handle current and future load.

Update Wiring

In addition to the wiring associated with lights and new circuits, replace existing wiring where needed and other renovations allow (i.e. wall replacement). Additionally, all circuits will be mapped and labelled.

Plumbing

Fix some plumbing while walls are exposed.

Switch Completely to Gas

We will convert the oil furnace to gas and remove the oil tank.

Sprinkler Heads

Move or eliminate some sprinkler pipes for aesthetic reasons where it can be accomplished without sacrificing coverage.

Phone system

Rewire the phone system to improve reliability. Also hook up remaining hermit jacks in personal rooms.

Exterior

Brookline Historical Society

We will consult and cooperate with the Brookline Historical Commission on the following projects:

Roof over Back Door Stairs to Pit

We will build a roof over the stairs from the parking lot into the Pit.


  
Figure 6: Proposed Roof over Back Door Stairs
\begin{figure}
\begin{center}
\epsfxsize=6in \epsfbox{rear-roof.eps}
\end{center}\end{figure}

Fix Up Fire Escape

Clean up parts that need to be cleaned up, rebolted, and straightened. Also get a new inspection certificate for it.

Fix Black Hole

Find a way to get the dry well in the back yard to drain. We are currently exploring options. Any solution will be done in consultation with the neighbors at 255 since costs should be split.

Repave Driveway

Completed Repave our section of the driveway and split the paving of the shared sections of the driveway with the neighbors at 255. Driveway repaving should be split with 255 paying 60% and ET paying 40% as shown by figure 7.


  
Figure 7: Approximate Driveway Measurements
\begin{figure}
\begin{center}
\epsfxsize=5in \epsfbox{driveway.eps}
\end{center}\end{figure}

Cap for Chimney

Install a chimney cap to increase the lifetime of the chimney.

Fix Porch Railing

Fix the rotted sections of the porch railing.

Gutters

General maintainence on the gutter system.

Dorm Ventilation

Improve air circulation in the dorm:

Equipment

Furniture

Replace Personal Room Furniture

Completed Replace the dressers, wardrobes, and shelving units with units of approximately the same volume and footprint.

Common Furniture

Replace and/or fix up crumbling furniture in the common areas.

Coke Room Reefers

Completed Replace the pit freezer and the older Coke Room reefer.

Washer and Dryer

Add a second washer/dryer set to the Bob (laundry room):

It is yet to be determined which machines should be located against the west wall.

Remaining Issues

There are several issues that are as yet unresolved that we are looking for ideas to solve. Some of these are included in the document and are collected here, while other issues are just included here.

APPENDIX

   
Sketches of Building Floor Plans

This appendix provides sketches of the floor plans of the building, labeled to assist in the understanding of the renovations text. These sketches are not to scale.


 
Figure 8: Basement (The Pit)
\begin{figure}
\begin{center}
\epsfxsize=6.5in \epsfbox{basement.eps}
\end{center}
\end{figure}


 
Figure 9: First Floor
\begin{figure}
\begin{center}
\epsfxsize=6.5in \epsfbox{firstfloor.eps}
\end{center}
\end{figure}


 
Figure 10: Second Floor
\begin{figure}
\begin{center}
\epsfxsize=6.5in \epsfbox{secondfloor.eps}
\end{center}
\end{figure}


 
Figure 11: Third Floor (The Dorm) sleeping area
\begin{figure}
\begin{center}
\epsfxsize=6.5in \epsfbox{dorm.eps}
\end{center}
\end{figure}

Current Placement of Electrical Outlets


  
Figure 12: Current Placement of Electrical Outlets
\begin{figure}
\begin{center}
\epsfxsize=6.5in \epsfbox{current-outlets.eps}
\end{center}\end{figure}

   
Schedule

August 15, 2000:
Architect walk-throughs complete
September 13, 2000:
Bids from architects due
September 25, 2000:
Bid accepted