ET symbol

SPUR


Return to SPUR Projects Summary

Return to SPUR Projects Home

Return to SPUR Home


Chapter Room Renovations

The Chapter Room will be getting a complete face lift and needed repairs as part of SPUR.

  • The drop ceiling will be removed. The crumbling ceiling above it will be restored.
  • The faux wood panelling on the walls will be removed. In its place, will be finished wallboard with wainscoting on the lower half of the wall.
  • The tile mosaic around the fireplace will be restored
  • The currently broken fireplace liner will repaired or replaced.
  • The parquet flooring, as in the rest of the house, will be replaced with hardwood flooring.
  • The sprinkler pipes inside the drop ceiling will be moved to the side wall.