Rearranging Pit Proper

Since Women's Head expanded into the workroom, the rooms around Pit Proper had to be rearranged. The Bob (the laundry room), which was in the center of the south wall, moved east up agains Women's Head. The work room hopped over the Bob and took over the Valve Room. The Valve room was mostly used as storage, so the storage was moved to the Tank room which used to hold the oil tank until we converted the furnace for the main two floors of the house to gas.

Before After

The south wall of Pit Proper.

A couple of pictures of the work room.

The laundry room (the Bob)

The valve room

The tank room with the oil tank

Construction

Roomless:

New concrete subfloor:

Room framing:

Replacing a leaking steam heating pipe:

Framing in the doorway:

Rooms boarded:

Slop sink in work room:

Tank room without tank: