< back table of contents next >

Women's Head
When Epsilon Theta first welcomed women into the house, the Women's Head contained only one shower and toilet, and was contained in the space that the current showers occupy. Women's Head was subsequently expanded, but the arrangement was still cramped and awkward. The SPUR Project expanded Women's Head into what was the Workroom and rearranged the fixtures. The door was moved to the north wall, where the sinks currently were.

Before After

Construction

Where women's head once stood and a view of the work room:

Cut up Women's Head floor for demo and the future entrance to Women's Head.

Demoing the Floor:

New Plumbing:

Concrete subfloor poured:

Shower to be:

The old doorway filled in:

The new doorway:

A view from the new doorway:

Framing:

Showers:

Wiring:

Insulation and wallboard:

Tile:

Plumbing:

Toilet stalls:


< back table of contents next >