< back | table of contents | next > |
The renovations also consisted of many other projects such as major plumbing and electrical work, dorm ventilation, and others that do not have their own pages.
Before | After |
The dorm before ventilation Left Front Right Front
|
Library
|
Removing the plaque:
And the living room soffit:
New wiring going in:
Plumbing Supplies ready to go:
New electrical service in phone hall:
Exploring the depths of the dorm:
A window uncovered in the ex-laundry room:
Supplies!:
Replacing Rotted plumbing:
Old pipes:
The command center:
Replacing electrical feed to the second floor that was damaged by the heat of the fireplace:
Framing a new ceiling in the library:
Second floor electrical work:
Patched walls:
Dorm fan:
New alarm work:
New electrical subpanels:
Patching living room:
Closet in library:
Phone hall ceiling fixed:
Lighting:
Trim:
Painting:
Plumbing Fixtures:
Living Room Painted:
Patching pit personal Rooms:
Plaque back up:
Curved crown moulding:
Door painting:
Library work:
< back | table of contents | next > |