< back | table of contents | next > |
To prevent future flooding of the Pit because of the in-ground stair well in the back of the house, SPUR added a roof over the stairwell.
Before | After |
Back of the house before the stairs
|
Framing started:
Roofing done:
Railing:
< back | table of contents | next > |